This information is to help determine whether an Expert Pre-sale and/or Pre-install Technical and Delivery Assessment (TDA) is required. SA855

Steps

You should be using IMPACT to complete your Checklists, submit your TDA Requests and document your reviews for Systems opportunities.  All required Checklists are in IMPACT.  Please use the link below to sign into IMPACT with your IBMid and password.  Note, IBM Business Partners also have access to IMPACT if they have a valid IBMid, password and are listed in their company's IBM Profile in PartnerPlus.

 
Locating the Trigger Criteria Lists & Education
If you are looking for the latest version of  Trigger Criteria or the IBM Software Trigger Criteria, please refer to the Trigger Criteria & Education section in IMPACT: https://www.ibm.com/tools/impact/triggerCriteriaEducationPage
    IBMers can also access at: https://www.ibm.com/support/pages/node/6355923
Information and education on the Solution Assurance process is also located in the Trigger Criteria & Education section in IMPACT.

 

 How to Read the Trigger Criteria and Designated Product List 

Definitions
R = Highly Recommended  
M = Mandatory
FICL = First In Client Location - unique physical address; this includes new systems, POCs, Try-n-buys (Trials) and Loaners
ALL = All proposals, orders and installations; this includes new systems, POCs, Try-n-buys (Trials) and Loaners
Superscript 1 = Product will not ship if Mandatory Pre-install TDA is not completed.  Some products also require the completion of the TDA Confirmation Form in Resource Link.

Pre-sale
The column titled Pre-sale TDA identifies which products and solutions require an Expert Pre-sale Technical and Delivery Assessment (TDA).  This TDA is performed before the final proposal is presented to the Client and before the Client agrees to purchase.  This includes new systems, POCs, Try-n-buys (Trials) and Loaners.  Pre-sale TDAs may also be required on upgrades and MES's.
Pre-install
The column titled Pre-install TDA identifies which products and solutions require an Expert Pre-install Technical and Delivery Assessment (TDA).  All products and solutions in this column are "Mandatory" and some have a "Stop Ship" in place.  Those products and solutions with a Mandatory requirement with a Stop Ship are denoted with a Superscript 1 and have an explanation at the bottom of their respective table.  The Pre-install TDA is mandatory before the system installs, however those with the Stop Ship require the TDA completion and TDA confirmation before it will ship.  This includes new systems, POCs, Try-n-buys (Trials) and Loaners.  Pre-install TDAs may also be required on upgrades and MES's.  BEST PRACTICE:  Perform the Pre-install TDA right after the Client agrees to purchase.
** Don't forget that the IBM SSR and the Client are required on the Pre-install TDA.**

Examples:
ABC Inc. is interested in a proposal for a TS4500.  The Pre-sale TDA is R - FICL =  Highly Recommended for the First in Client Location.
ABC Inc. purchases a TS4500.  The Pre-install TDA is M - FICL =  Mandatory if it is the First in the Client Location.
ABC Inc. is interested in a proposal for a FlashSystem 7300.  The Pre-sale TDA is M - FICL =  Mandatory for the First in Client Location.
ABC Inc. is interested in purchasing a new LinuxOne III system.  The Pre-sale TDA is M - ALL =  Mandatory for all proposals and the Pre-install TDA is M - ALL1 =  Mandatory with a Stop Ship for all orders.  Before the order will ship, a TDA Confirmation Form must be submitted via Resource Link to confirm the completion of the Pre-install TDA.

The appropriate IBM-developed and published collateral must be used to facilitate and document a mandatory expert level Pre-sale or Pre-install Technical and Delivery Assessment (TDA).  You must use the most current version of the collateral found in IMPACT.  If you are reviewing a product that does not have a product-specific Checklist, then you must utilize the IBM-developed and published General Pre-sale and/or Pre-install checklists, also found in IMPACT.

  

  

 SA Trigger Criteria and Designated Product List PDF File 

  

SA Trigger Criteria and Designated Product List 070720.pdf
SA Trigger Criteria and Designated Product List 051123.pdf

The following information is the same as what is contained in the PDF.

  

 IBM zSystems

 IBM zSystems
 Product   Machine Type   Model   Feature Code   Pre-sale TDA   Pre-install TDA 
 UT
Code 
IBM z16 - Single Frame - New System (including PoCs, Try-n-Buys and Loaners) 3932 A02  M - FICL M - ALL1 30CD4
Upgrade from a 8562 (z15) to 3932 (A02) 8562 M - FICL M - ALL1
Upgrade from a 3907 (z14) to 3932 (A02) 3907 M - FICL M - ALL1
IBM z16 - Rack Mount - New System (including PoCs, Try-n-Buys and Loaners) 3932 AGZ  M - FICL M - ALL1 30CD4
Upgrade from a 8562 (z15) to 3932 (z16 Rack Mount bundle FC 0515) 8562 M - FICL M - ALL1
Upgrade from a 3907 (z14) to 3932 (z16 Rack Mount bundle FC 0515) 3907 M - FICL M - ALL1
 IBM z16 - New System  3931 A01  M - FICL  M - ALL1 30COK
Upgrade from a 8561 (z15) to 3931 (A01) 8561  M - FICL  M - ALL1
Upgrade from a 3906 (z14) to 3931 (A01) 3906  M - FICL  M - ALL1
IBM z15 - New System  8561 T01     M - FICL    M - ALL1   30CHU 
Upgrade from a 2964 (z13) to 8561 (T01)  2964  M - FICL  M - ALL1
Upgrade from an 3906 (z14) to 8561 (T01) 3906  M - FICL  M - ALL1   
IBM z15 - New System  8562 T02  M - FICL    M - ALL1   30CUL
Upgrade from a 3907 (z14) to 8562 (z15) 3907 ZR1  M - FICL   M - ALL1
Upgrade from an 8562 (LT2) to 8562 (T02) 8562 LT2  M - FICL  M - ALL1
IBM z14 - GARS Certified Pre-Owned (CPO) Program 3906 M01, M02, M03, M04, M05
RPQ 8P2782
or
8P2783
 M - FICL   M - ALL1   
IBM z14 - GARS Certified Pre-Owned (CPO) Program 3907 ZR1
RPQ 8P2782
or
8P2783
 M - FICL   M - ALL1
                    
 1 = Product will not ship if Mandatory Pre-install TDA is not completed.  See the following comments. 

The following z Systems (3906, 3907, 3931, 3932, 8561 and 8562) denoted with a superscript numeral 1, require that a Pre-install TDA be confirmed before the order will ship.  It is the responsibility of the Opportunity Owner (OO) to ensure that the review is successfully completed and confirmed with the submission of a TDA Confirmation Form before the scheduled ship date.  The TDA Confirmation Forms are on the Resource Link website.  For any issues with the Resource Link website, send an email to reslink@us.ibm.com .

The TDA is an opportune time to request that Clients enroll in the IBM Security Portal, if they have not already.  See the Pre-sale Checklists for details.

  

 IBM LinuxONE Systems

 IBM LinuxONE Systems  
 Product   Machine Type   Model   Feature Code   Pre-sale TDA   Pre-install TDA   UT Code 
IBM LinuxONE Rockhopper 4 - Single Frame - New System (including PoCs, Try-n-Buys and Loaners) 3932 LA2 M - FICL  M - ALL1 30CD9
IBM LinuxONE Rockhopper 4 - Rack Mount - New System (including PoCs, Try-n-Buys and Loaners) 3932 AGZ M - FICL  M - ALL1 30CD9
 IBM LinuxONE Emperor 4 - New System 3931 LA1  M - ALL   M - ALL1 30C1U
IBM LinuxONE III - New System  8561 LT1  M - ALL   M - ALL1 30C7H
IBM LinuxONE III LT2 - New System  8562 LT2  M - ALL   M - ALL1 30CNK
IBM LinuxONE III Express - New System
   * Use the LinuxOne III Express Checklist for the Pre-sale TDA
   * Use the  z15 T02 and LinuxONE III LT2 Checklist for the Pre-install TDA
8562 LT2  M - ALL   M - ALL1 30CNK
 1 = Product will not ship if Mandatory Pre-install TDA is not completed.  See the following comments. 

  

The following LinuxONE Systems (3931, 3932, 8561 and 8562) denoted with a superscript numeral 1, require that a Pre-install TDA be confirmed before the order will ship.  It is the responsibility of the Opportunity Owner (OO) to ensure that the review is successfully completed and confirmed with the submission of a TDA Confirmation Form before the scheduled ship date.  The TDA Confirmation Forms are on the Resource Link website.  For any issues with the Resource Link website, send an email to reslink@us.ibm.com .

The TDA is an opportune time to request that Clients enroll in the IBM Security Portal, if they have not already.  See the Pre-sale Checklists for details.

  

  

 Power Systems 

 Power 

 

 Product 

 Machine Type 

 Model 

 Feature Code 

 Pre-sale TDA 

 Pre-install TDA 

 UT Code 

 Power E1080 
New System: Power E1080
9080 HEX    M - ALL    M - ALL1 30CW5
MES: Power E980 - addition of a node to an existing 9080-HEX
9080 HEX    M - FICL     M - FICL  30CW5

 Power E980 

  

  

  

  

  

  

New System: Power E980

9080

M9S

   M - ALL 

   M - ALL1

30CWD

Certified Pre-Owned (CPO) Program:
Power E980
9080 M9S 9993   M - ALL     M - ALL1 30CWD

MES Upgrade: Power E870 from 9119-MME to 9080-M9S or Power E870C from 9080-MME to 9080-M9S

9080

M9S

   M - ALL 

   M - ALL1

30CWD

MES Upgrade: Power E880 from 9119-MHE to 9080-M9S or Power E880C from 9080-MHE to 9080-M9S

9080

M9S

   M - ALL 

   M - ALL1

30CWD

MES: Power E980 - addition of a node to an existing 9080-M9S

9080

M9S

   M - FICL 

   M - FICL 

30CWD

  

  

  

  

  

  

  

 IBM Power AC922 

  

  

  

  

  

  

Power AC922 - Water Cooled Only

8335

GTX

 M - ALL 

  

30CXO

  

  

  

  

  

  

  

 1 = Product will not ship if required mandatory TDAs are not completed and/or the TDA Confirmation Form is not completed.  See the following comments. 

  

 Note: FICL (First in Client Location) means the Client has previously purchased the one or more products listed in the row and is installed at the same physical address.

For Power E980 and E1080, the TDA Confirmation Form must be submitted with the response that the Pre-install TDA was completed for all orders before they ship.

  Note: Only one TDA Confirmation Form needs to be submitted for orders that match on the customer number, PSSD (schedule ship date), and MT.   

 

It is the responsibility of the Opportunity Owner (OO) to ensure that the required TDAs are successfully completed and the TDA Confirmation Forms are submitted before the scheduled ship date.  The TDA Confirmation Forms are on the Resource Link website.  For any issues with the Resource Link website, send an email to reslink@us.ibm.com .

  

  

 Storage Systems 

 Storage  

 

 Product 

 Machine Type 

 Model 

 Feature Code 

 Pre-sale    TDA 

 Pre-install TDA 

 UT Code 

 System Storage DS8000 

  

  

DS8000 (DS8880)

283x, 533x

ALL

  

R - FICL

M - FICL 

30C8R

DS8880 solutions adding Copy Services (CS)

283x, 533x

8251

M - FICL 

M - FICL 

DS8880 solutions adding IBM i - iSeries Attach

283x, 533x

0931

R - FICL

M - FICL 

DS8900F (DS8910F, DS8950F, and DS8980F)

5331, 5332, 5333, 5334, 5341

993, 994, 996, 998

  

M - ALL

M - ALL 

30C8R

DS8900F solutions adding Copy Services (CS)

5331, 5332, 5333, 5334, 5341

8251, 8252, 8253, 8254, 8255, 8256, 8260

M - ALL 

M - ALL 

DS8900F solutions adding IBM i - iSeries Attach

5331, 5332, 5333, 5334, 5341

0931

M - ALL

M - ALL 

 Product 

 Machine Type 

 Model 

 Feature Code 

 Pre-sale TDA 

 Pre-install TDA 

 UT Code 

 IBM FlashSystem 

  

  

  

  

  

  

IBM FlashSystem 5200

4662

6H2, UH6

M - FICL 

30CVD

IBM FlashSystem 5200 with Feature Code B0SK
Feature Code B0SK = ServicePac Machine Set up Support for Storage
4662 6H2, UH6, 12G, 24G, 92G B0SK M - FICL M - ALL 30CVD
IBM FlashSystem 7200 with Feature Code B0SK
Feature Code B0SK = ServicePac Machine Set up Support for Storage
4664 12G, 24G, 92G B0SK M - FICL M - ALL 30CVI
IBM FlashSystem 7300
4657 924, U7D M - FICL 30CVI
IBM FlashSystem 7300 with Feature Code B0SK
Feature Code B0SK = ServicePac Machine Set up Support for Storage
4657 924, U7D, 12G, 24G, 92G B0SK M - FICL M - ALL 30CVI

IBM FlashSystem 9100 (Expansions)

9846, 9848

A9F, AFF

M - FICL 

M - FICL 

30CVL

IBM FlashSystem 9200, 9200R and 9200 with Expert Care - (New and MES Upgrades)

FlashSystem 9200 Models AG8 and UG8 require: IBM Spectrum Virtualize for FlashSystem 9150 and 9200 Software V8.3.1 or later FlashSystem 9200 Model AG8 requires: IBM Spectrum Virtualize Software for SAN Volume Controller (Software PID 5641-VC8 in iERP/AAS and Software PID 5725-M19 in Passport Advantage) for external virtualization

9846, 9848, 4666, with Software PID 5639-FA3

AG8, UG8

M - ALL 

M - ALL 

30CVL

IBM FlashSystem 9200, 9200R, and 9200 with Expert Care (Expansions)
9846, 9848, 4666 A9F, AFF M - FICL M - FICL 30CVL

IBM FlashSystem 9500 (New, MES Upgrades, and Expansions)

IBM Spectrum Virtualize Software for FlashSystem 9500 Controller SW PID 5639-011

4666

AH8, UH8, A9F, AFF

M - ALL 

M - ALL 

30CVL

 

 

  

 Removable Storage 

TS7770 Virtualization Engine for Tape

3948, 3957

VED

R - ALL

M - ALL 

30CGN

TS7770 Virtualization Engine for Tape - GARS Certified Pre-Owned (CPO) Program
3957 VEC R - ALL M - ALL  30CGN

TS7770 Virtualization Engine adding Grid Enablement

3948, 3957

VED

4015

R - ALL

M - ALL 

30CGN

TS7770 Virtualization Engine adding Tape Attach

3948, 3957

VED

5273

R - ALL

M - ALL 

30CGN

TS7000 Family Virtualization Engine adding Encryption Configuration

3948, 3957

VED

9900

R - FICL

M - ALL 

30CGN

TS4500 Tape Library

3584

L25, L55

R - FICL

M - FICL 

30C8H

TS4500 Tape Library using or adding Transparent LTO Encryption

3584

L25, L55

1604

R - FICL

M - FICL 

30C8H

TS4500 with High Availability (2nd Accessor)

3584

L25, L55

9040

M - ALL 

M - ALL 

TS7700 support for TS4500

3584

L25, L55

9217

M - ALL 

M - ALL 

IBM System Storage TS1150 Tape Drive ----> Use the TS4500 Checklist

3592

E08, EH8

M - FICL 

30CXC

IBM System Storage TS1160 Tape Drive ----> Use the TS4500 Checklist

3592

60F, 60G, 60S

M - FICL 

30CXC

 Product 

 Machine Type 

 Model 

 Feature Code 

 Pre-sale TDA 

 Pre-install TDA 

 UT Code 

IBM Storage Fusion HCI  -  Including New Systems, MES Upgrades, and Node Expansions
9155 R42
M - ALL
 
Initiates in StorM and flows into IMPACT
M - ALLA
Initiates in StorM and flows into IMPACT
30CA3

 
Storage as a Service (STaaS) 9601 BT1, BT2, BT3, BT4, BT5, MT1, MT2, MT3, MT4, MT5, HT1, HT2, HT3, HT4, HT5
M - ALLA
Initiates in StorM and flows into IMPACT
30CK4

Spectrum Virtualize

  

  

  

  

  

  

 SAN Volume Controller 

  

SVC with Initial Storage Engine

2145, 2147

SV1

R - FICL

M - FICL 

30C2R

SVC with Metro/Global Mirror

2145 or 2147 with Software PID 5641-VC7 or 5725-M19

SV1

0679

M - FICL 

M - FICL   

  

All SVC (new or existing) adding Real-time Compression  

Software PID 5641-CP7 or 5725-H04

SV1

  

M - ALL 

  

  

SVC with Initial Storage Engine SVC Models SA2 and SV2 require: IBM Spectrum® Virtualize Software V8.3.1, or later

2145, 2147 with Software PID 5641-VC8 in iERP/AAS and Software PID 5725-M19 in Passport Advantage

SA2, SV2

R - FICL

M - FICL 

30C2R

SVC with Initial Storage Engine
2145, 2147 SV3 R - FICL M - FICL 30C2R
 IBM Spectrum Virtualize on Public Cloud for Azure 5737 F08 M - ALL 30CG7

 IBM Spectrum Virtualize on Public Cloud and AWS 

5737

F08

  

M - ALL 

  

30CG7

  

  

  

  

  

  

  

 Elastic Storage System (ESS) - Including New Systems, PoCs, Loaners, MES Upgrades, and Expansions 

5105

5141

5141

5141

5147

5147

5147

5147

5147

5148

5148

22E

AF8

FN1

FN2

024

084

092

102

106

21L

22L

  

M - ALLA

Initiates in StorM and flows into IMPACT

Note: MES' initiate in IMPACT

M - ALLA2

Initiates in StorM and flows into IMPACT

30C2F

  

  

  

  

  

  

  

 Spectrum Scale - Including New Systems, PoCs, Loaners, MES Upgrades, and Expansions 

5725

5641

5725

Q01

GPF

S28

M - ALLA

Initiates in StorM and flows into IMPACT

30CG8

 A = The process starts in Storage Modeller (StorM) and hands off to IMPACT.

 2 = New Elastic Storage Systems and Loaners through a Try & Buy Program will not ship if required Pre-install TDAs are not completed and the TDA Confirmation Form is not submitted through Resource Link. See the following comments. 

New Elastic Storage Systems and Loaners through a Try & Buy Program (denoted with a superscript numeral 2) that require the submission of an order through manufacturing, require that a Pre-install TDA be confirmed before the order ships.  Note: Only one TDA Confirmation Form needs to be submitted for orders that match on the customer number, PSSD (schedule ship date) and MT.  Equipment sourced through the Loaner Pool does not require a TDA Confirmation Form.

ESS Loaners, PoCs, MES Upgrades, and Expansions still require the completion of both Pre-sale and Pre-install TDAs, but do not require the submission of the TDA Confirmation Form.

It is the responsibility of the Opportunity Owner (OO) to ensure that the reviews are successfully completed and confirmed with the submission of a TDA Confirmation Form before the scheduled ship date.  The TDA Confirmation Forms are on the Resource Link website.  For any issues with the Resource Link website, send an email to reslink@us.ibm.com.

  

  

 Networking 

  

 Networking 
 Product   Machine Type   Model   Feature Code   Pre-sale TDA  Pre-install TDA   UT Code 
 System Networking                   
SAN
SAN42B-R 2498 R42 R - FICL
SAN64B-6 (Use SAN 2498 Switch Checklist) 8960 F64, F65, N64, N65 R - FICL   
SAN64B-7 (Use SAN 2498 Switch Checklist) 8960 P64, R64 R - FICL
SAN96B-5 FC Switch (Use SAN 2498 Switch Checklist) 2498 F96 R - FICL
SAN128B-6 (Use SAN 2498 Switch Checklist) 8960 F97, N97 R - FICL
SAN256B-6 (Use SAN 8961 Director Checklist for Pre-sale) 8961 F04 M - FICL   M - FICL 
SAN256B-7 (Use SAN 8961 Director for Pre-sale; Use SAN256B-6 Pre-install Checklist) 8961 F74 M - FICL M - FICL
SAN512B-6 (Use SAN 8961 Director Checklist for Pre-sale) 8961 F08 M - FICL  M - FICL 
SAN512B-7 (Use SAN8961 Director Checklist for Pre-sale; Use SAN512B-6 Pre-install Checklist) 8961 F78 M - FICL M - FICL

  

  

 Change Logs

 Date   Description of the Change 
05/11/2023 Updated links
04/20/2023
Storage: All DS8900F opportunities now require a Pre-sale and Pre-install TDA for ALL proposals and ALL installs.
Storage: Updates to new brand names.
04/05/2023
Z: Corrected MT for z16 Rack Mount to 3932
Z: Added Upgrades for z16 Single Frame and Rack Mount
04/04/2023 Z: Added z16 - Single Frame - New System (including POCs, Try-n-Buys and Loaners) - 3932 - A02 -   - M - FICL - M - ALL1 - 30CD4
Z: Added z16 - Rack Mount - New System (including POCs, Try-n-Buys and Loaners) - 3932 - AGZ -   - M - FICL - M - ALL1 - 30CD4
Z: Corrected CPO Program superscript from an asterisk to a 1 to match non-CPO requirements.
LinuxONE: Added LinuxONE Rockhopper 4 - Single Frame - LA2 -   - M - FICL - M - ALL1 - 30CD9
LinuxONE: Added LinuxONE Rockhopper 4 - Rack Mount - AGL -   - M - FICL - M - ALL1 - 30CD9
Storage: Removed IBM System Storage TS1140 Tape Drive - 3592 - E07, EH7 -   -   - M - FICL - 30CXC; End of Service
Storage: Added IBM System Storage TS1160 Tape Drive - 3592 - 60F, 60G, 60S -   -   - M - FICL - 30CXC
03/21/2023 Updated description of page
Updated links
Clarified that TDAs are required on POCs, Try-n-Buys/Trials and Loaners.
Removed "Checklist Location" columns as all Checklists are now in IMPACT
Removed references to File & Object Solutions Design Engine (FOSde) as everyone should be transitioning to StorM per announcement from Frank Lee.
Storage: Removed all requirements for new (non-CPO) DS8800's MT 283x, as they are EOM
Storage: Added Model E96 to DS8900F
Storage: Added DS8900F (MT 5341) with Expert Care for CPO Program
Storage: Added IBM FlashSystem 7200 - GARS Certified Pre-Owned (CPO) Program - 2076 - 824, 12G, 24G, 92G, U7C - 9994 - M - FICL -   - 30CVI
Storage: Added IBM FlashSystem 7200 with Feature Code B0SK - GARS Certified Pre-Owned (CPO) Program - 4664 - 12G, 24G, 92G, U7C - 9994 and B0SK - M - FICL - M - ALL - 30CVI
12/16/2022 Fixed Z table; No change to content.
10/26/2022 Z: Added z14 and z14 ZR1 back to list for the GARS Certified Pre-Owned (CPO) Program
LinuxONE: Added IBM LinuxONE Emperor 4 - New System - 3931 - LA1 -   - M - ALL - M - ALL1 - 30C1U - IMPACT
Power: Added E980 to list for the GARS CPO Program; Certified Pre-Owned (CPO) System: Power E980 - 9080 - M9S - 9993 - M - ALL - M - ALL1 - 30CWD - IMPACT
Storage: Added MT 5341 to DS8900F
Storage: Removed FS7200 2076-824, U7C and 4664-824, U7C as they are withdrawn from Marketing
Storage: Removed models 824 and U7C from IBM FlashSystem 7200 MT 4664 as they are withdrawn from Marketing
Storage: Added MT 3948 to TS7700
Storage: Added back TS7700 MT 3957 Model VEC for the GARS Certified Pre-Owned (CPO) Program
Storage: Added 5147-102 to ESS
Storage: Removed instructions to use the FS9500 Pre-install Checklist for the FS7300 with FC B0SK; there is a FS7300 Pre-install Checklist to use
06/17/2022 Storage: Updated FOSde link for ESS and Spectrum Scale
05/26/2022
Z: The z16 Pre-install Checklist is available in IMPACT - changed info in Checklist Location column
Storage: Added new ESS System MTM 5141-FN2
04/05/2022 Z: Added z16 - New System - 3931 - A01 -   - M - FICL - M - ALL1 -  30COK - Pre-sale IMPACT; Pre-install Coming Soon
Z: Added z16 Upgrade from 8561 (z15) to 3931 (z16) - 8561 -   -   - M - FICL - M - ALL1 -   - Pre-sale IMPACT; Pre-install Coming Soon
Z: Added z16 Upgrade from 3906 (z14) to 3931 (z16) - 3906 -   -   - M - FICL - M - ALL1 -   - Pre-sale IMPACT; Pre-install Coming Soon
Z: Removed z14 - New System - 3906 - M01, M02, M03, M04, M05 -   - M - FICL - M - ALL1 - 30C5P - IMPACT; end of marketing as of June 30, 2021
Z: Removed z14 Upgrade from a 2827 (zEC12) to 3906 (z14) - 2827 -   -   - M - FICL - M - ALL1 -   - IMPACT; end of marketing as of June 30, 2021
Z: Removed z14 Upgrade from a 2964 (z13) to 3906 (z14) - 2964 -   -   - M - FICL - M - ALL1 -   - IMPACT; end of marketing as of June 30, 2021
Z: Removed IBM Dynamic Partition Manager (DPM) - 3906 -   - 0016 - M - ALL -   -   - IMPACT
Z: Removed z14 - New System - 3907 - ZR1 -   - M - FICL - M - ALL1 - 30CCJ - IMPACT; end of marketing as of September 30, 2021
Z: Removed z14 Upgrade from a 2965 (z13s) to 3907 (z14) - 2965 -   -   - M - FICL - M - ALL1 -   - IMPACT; end of marketing as of September 30, 2021
Z: Removed IBM Dynamic Partition Manager (DPM) - 3907 -   - 0016 - M - ALL -   -   - IMPACT
LinuxONE: Removed LinuxONE Emperor II - New System - 3906 - LM1, LM2, LM3, LM4, LM5 -   - M - ALL - M - ALL1 - 30CBZ - IMPACT; end of marketing as of June 30, 2021
LinuxONE: Removed LinuxONE Rockhopper II - New System - 3907 - LR1 -   - M - ALL - M - ALL1 - 30C1M - IMPACT; end of marketing as of September 30, 2021
Storage: Added "Use the FS9500 Pre-install Checklist for the Pre-install TDA" to FS5200, FS7200 and 7300 sold with FC B0SK
Storage: Added MT 2147 to SAN Volume Controller Model SV3
03/14/2022
Storage: Removed Model Y12 from FlashSystem 5200
Storage: Added FlashSystem 5200 with Feature Code B0SK - 4662 - 6H2, UH6, 12G, 24G, 92G - B0SK - M - FICL - M - ALL - 30CVD - IMPACT
Storage: Added FlashSystem 7200 with Feature Code B0SK - 4664 - 824, U7C, 12G, 24G, 92G - B0SK - M - FICL - M - ALL - 30CVI - IMPACT
Storage: Added FlashSystem 7300 - 4657 - 924, U7D -   - M - FICL -   - 30CVI - IMPACT
Storage: Added FlashSystem 7300 with Feature Code B0SK - 4657 - 924, U7D, 12G, 24G, 92G - B0SK - M - FICL - M - ALL - 30CVI - IMPACT
Storage: Removed FlashSystem 9100 New, MES Upgrades and Models AF7 and AF8 (as they are withdrawn from marketing).  Moved Expansions (Models A9F and AFF) to a new line with a M - FICL requirement for both Pre-sale and Pre-install TDAs.
Storage: Added FlashSystem 9200 with Expert Care (MT 4666) to FlashSystem 9200 and 9200R row.  Moved Expansions (Models A9F and AFF) to a new line with a M - FICL requirement for both Pre-sale and Pre-install TDAs.

Storage: Added FlashSystem 9500 (New, MES Upgrades and Expansions) - 4666 with Software PID 5639-011 - AH8, UH8, A9F, AFF -   - M - ALL - M - ALL - 30CVL - IMPACT
Storage: Added SAN Volume Controller (SVC) with Initial Storage Engine - 2145 - SV3 -   - R - FICL - M - FICL - 30C2R - IMPACT
Storage: Deleted IBM FlashSystem A9000/9000R - 9835, 9836, 9837, 9838 - 415, 425 -   - M - ALL - M - ALL - 30CGG - IMPACT; as they are withdrawn from marketing
Storage: Deleted IBM FlashSystem V9000 - 9846, 9848 - AC3, AE3 -   - M - ALL - M - ALL - 30CWY - IMPACT; as they are withdrawn from marketing
Storage: Deleted IBM FlashSystem V9000 (Adding expansions to an existing install) - 9846, 9848 - 12F, 24F, 92F -   - M - ALL - M - ALL - 30CWY - IMPACT; as they are withdrawn from marketing
Storage: Deleted IBM Flash System V9000 with Metro/Global Mirror - 9846, 9848 with Software PID 5641-RB7 or 5641-RB8 - 0679 - M - FICL - M - FICL -    - IMPACT; as FSV9000 is withdrawn from marketing
11/30/2021
Storage: Removed FlashSystem 5100 - 2077, 2078 with Software PID 5639-SV9 - 4H4, UHB -   - M - FICL -   - 30CVD - IMPACT; as it is withdrawn from marketing
Storage: Added IBM Spectrum Virtualize on Public Cloud for Azure - 5737 - F08 -   - M - ALL -   - 30CG7 - IMPACT
11/19/2021 All: Fixed table column width issues on web view.  Deleted older notes in change log.  No changes to Trigger Criteria or pdf file.
10/12/2021 IBM Z: Added IBM LinuxONE III Express - New System - 8562 - LT2 -   - M - ALL - M - ALL1 - 30CNK - IMPACT
09/08/2021 IBM Z: Removed IBM z14 zEnsemble Membership - 3906 -   - 0025 - M - ALL -   -   - SA1069 (from z14)
IBM Z: Removed IBM z14 zEnsemble Membership - 3906 -   - 0025 - M - ALL -   -   - SA1071 (from z14 ZR1)
Power: Added Power E1080 - New System - 9080 - HEX -   - M - ALL - M - ALL1 - 30CW5 - IMPACT
Power: Added Power E1080 - MES - addition of a node to an existing 9080-HEX - 9080 - HEX -   - M - FICL - M - FICL - 30CW5 - IMPACT
Power: Updated verbiage below table.
08/17/2021 Storage: Added Storage as a Service (STaaS) - 9601 - BT1, BT2, BT3, BT4, BT5, MT1, MT2, MT3, MT4, MT5, HT1, HT2, HT3, HT4, HT5 -   -   - M - ALL - 30CK4 - IMPACT Initiates in StorM
08/10/2021 Storage: Added IBM Spectrum Fusion HCI - Including New Systems, MES Upgrades and Node Expansions - 9155 - R42 -   - M - ALL - M - ALL - 30CA3 - IMPACT
07/27/2021 Storage: Removed IBM FlashSystem 900 - 9840, 9843 - AE3, UFE,   - M - FICL -   - 30CWY - IMPACT; as it is withdrawn from marketing
Storage: Removed Storwize V5100 - 2077. 2078 - 424, AF4, U5B -   - M - FICL -   - 30CVA - IMPACT; as it is withdrawn from marketing
Storage: Added MTM 5141-FN1 to Elastic Storage Server (ESS)
Storage: Removed IBM Spectrum Virtualize software only - 5725 - Z61 -   - M - ALL -   -   - IMPACT; as it is withdrawn from marketing
Storage: Added DS8980F Model 998
Storage: Removed all TS7700 TDA Requirements for Models V06, V07, VEA, and VEB since they are withdrawn from marketing
Networking: Added SAN128B-6 (Use SAN 2498 Switch Checklist) - 8960 - F97, N97 -   - R - FICL -   -   - IMPACT
Networking: Added MT F65 and N65 to the SAN64B-6
Networking: Added SAN256B-7 (Use SAN 8961 Director Checklist for Pre-sale; Use SAN256B-6 Pre-install Checklist) - 8961 - F74 -   - M - FICL - M - FICL -   - IMPACT
Networking: Added SAN512B-7 (Use SAN 8961 Director Checklist for Pre-sale; Use SAN512B-6 Pre-install Checklist) - 8961 - F78 -   - M - FICL - M - FICL -   - IMPACT
Networking: Added SAN64B-7 (Use SAN 2498 Switch Checklist) - 8960 - P64, R64 -   - R - FICL -   -   - IMPACT
02/08/2021
Power: Removed all Power E870 (9119-MME) requirements since it is withdrawn from marketing
Power: Removed all Power E870C (9080-MME) requirements since it is withdrawn from marketing
Power: Removed all Power E880 (9119-MHE) requirements since it is withdrawn from marketing
Power: Removed all Power E880C (9080-MHE) requirements since it is withdrawn from marketing
Storage: Added FlashSystem 5200 - 4662 - 6H2, UH6, Y12 -   - M - FICL -   - 30CVD - IMPACT
Storage: Removed all Storwize V7000 requirements since it is withdrawn from market
Storage: Removed all Storwize V7000F requirements since it is withdrawn from market
Storage: Added Model VED to TS7000 Family Virtualization Engine adding Encryption Configuration (MT: 3957) Feature Code 9900
Networking: Removed SAN24B-5 FC Switch (Use SAN 2498 Checklist) - 2498 - X24 -   - R - FICL -   -   - IMPACT; as it is withdrawn from marketing
Networking: Removed SAN48B-5 (Use SAN 2498 Switch Checklist) - 2498 - F48 -   - R - FICL -   -   -   ; as it is withdrawn from marketing
Networking: Removed SAN384B-2 SAN Director (Use SAN 2499 Director Checklist for Pre-sale) - 2499 - 416 -   - M - FICL - M - FICL -   - IMPACT; as it is withdrawn from marketing
Networking: Removed SAN768B-2 SAN Director (Use SAN 2499 Director Checklist for Pre-sale) - 2499 - 816 -   - M - FICL - M - FICL -   - IMPACT; as it is withdrawn from marketing

  

  

 

Special Note for Business Partners 

The purpose of a Pre-sale TDA Checklist is to provide a roadmap of questions to use when reviewing a configuration and proposal for IBM products and solutions. The purpose of a Pre-install TDA Checklist is to provide a roadmap of questions to use when assessing site readiness and preparing for the installation or implementation. These reviews occur at two different and distinct points in the sales cycle. IBM developed product/solution-specific documentation must be used, completed, and stored by IBM personnel and Business Partners, who are involved in the Pre-sale and/or Pre-install Technical and Delivery Assessment (TDA), as evidence of a completed expert review.

 

These documents have not been subjected to any formal IBM test and are distributed on an "as-is" basis without any warranty either expressed or implied. Contents must be evaluated for applicability to a particular proposal. Pertinent information from these documents can be discussed with, and/or abstracted for a presentation to a Client. However, any code included is for internal information purposes only and can not be given to Clients. If included code is identified as "incidental programming", its use must conform to IBM guidelines. IBM or BP personnel can make reproductions of this information for their own use. Responsibility for maintaining appropriate security accompanies such reproductions.

 

In these documents, any references made to an IBM licensed program are not intended to state or imply that only IBM's licensed program can be used; any functionally equivalent program might be used instead. References in these publications to IBM products, programs, or services do not imply that IBM intends to make these available outside of the United States.

 

The TDA documents do not contain all of the product information that can be required to design a complete solution or complete an installation. Additional product and related information can be referenced or found on the IBM website.

  

 Disclaimer 

 

The documentation is being made available in a revisable format to authorized Business Partners on an "as-is" basis. IBM makes no representations or warranties regarding these Materials and does not provide any guarantee or assurance that the use of such Materials will result in a successful Client proposal or installation. It is provided solely for the use of IBM Business Partners to facilitate the Technical and Delivery Assessment and document as such. The Business Partner takes responsibility for any of its contents and their solutions, in compliance with the IBM Business Partner Agreement.

© Copyright 2023 IBM Corporation.  All rights reserved.

  

 End of document. 

Document Location

Worldwide

[{"Business Unit":{"code":"BU051","label":"N\/A"},"Product":{"code":"SUPPORT","label":"IBM Worldwide Support"},"ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"All Version(s)","Line of Business":{"code":"LOB33","label":"N\/A"}}]

Document Information

Modified date:
11 May 2023

UID

SA855